Motus Warehouse Nelspruit
![1.jpeg](https://static.wixstatic.com/media/586b9f_5b6173d1d5c844e686bb76bf1fbcc932~mv2.jpeg/v1/fill/w_912,h_341,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/1.jpeg)
Motus, Warehouse Nelspruit
Products:
Date Completed:
Elctro-Mechanical Natural Smoke Ventilation System
March 2022
Project Detail:
Another successful completion of a natural smoke ventilation project at Motus, Warehouse Nelspruit.
Scope of work:
Twenty-Two (22) Fire-X 1620H EN12101 certified electro mechanical system, activated by Two (2) 24V single phase OS2 Control panels complete with a 72-hour battery back-up system.
This smoke ventilation system is also equipped with a fail-safe fusible link back up system that will release and open the spring-loaded louvre blades in case of a fire.
The smoke ventilation system is triggered by a signal from the smoke detection system when smoke is detected in the building.
![1_edited.jpg](https://static.wixstatic.com/media/586b9f_5ba7842a821a46a4976aca6661c3c183~mv2.jpg/v1/fill/w_57,h_20,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/1_edited.jpg)
Natural Smoke Mechanical Ventilation System